Friday, April 30, 2010

4th Week Day 4~5

Design Ramp for Office Block

Done an Excel file to locate beams in acad file.


Create New Excel file to ease up calculations for loading.





4th Week Day 2~3


Design Beam for Kiara Hills Condo - Block 6 Using MTM and Excel Sheet

Designed

L21-B20B

L21-B25A

L21-B35A

L21-B40A

L21-B40Aii
L21-B49i
L21-B49ii
L21-B50

L21-B51


Do checking of Beam on the dimension and design.


Design Beam for Terrace House

Designed only B1a and B16


Attended Safety Talk oraganized by SKM.

4th Week Day 1

Design Ramp for MB06057 (Continue from last week)

*Finished doing the job given on this day*

3rd Week Day 4~5


Learned Design of ramp through Inez.

Design external ramp for Proj MB06057


Design of ramp was done using : MTM and Excel sheet for checking of bar spacing and Percentage of steel


*Note - LL of Ramp = 20kN/m² if usage by firetruck was considered.


As = M/ 0.95 Fy Z

Wednesday, April 21, 2010

3rd Week Day 3

Learn the theory for Design of Retaining wall

Learn the basic of design of Retaining wall using MTM

3rd Week Day 2

Medical Leave Due to Flu

3rd Week Day 1

Determine the Loading for slab of Ground floor
Design Column for Ground Floor