Friday, April 30, 2010

4th Week Day 4~5

Design Ramp for Office Block

Done an Excel file to locate beams in acad file.


Create New Excel file to ease up calculations for loading.





4th Week Day 2~3


Design Beam for Kiara Hills Condo - Block 6 Using MTM and Excel Sheet

Designed

L21-B20B

L21-B25A

L21-B35A

L21-B40A

L21-B40Aii
L21-B49i
L21-B49ii
L21-B50

L21-B51


Do checking of Beam on the dimension and design.


Design Beam for Terrace House

Designed only B1a and B16


Attended Safety Talk oraganized by SKM.

4th Week Day 1

Design Ramp for MB06057 (Continue from last week)

*Finished doing the job given on this day*

3rd Week Day 4~5


Learned Design of ramp through Inez.

Design external ramp for Proj MB06057


Design of ramp was done using : MTM and Excel sheet for checking of bar spacing and Percentage of steel


*Note - LL of Ramp = 20kN/m² if usage by firetruck was considered.


As = M/ 0.95 Fy Z

Wednesday, April 21, 2010

3rd Week Day 3

Learn the theory for Design of Retaining wall

Learn the basic of design of Retaining wall using MTM

3rd Week Day 2

Medical Leave Due to Flu

3rd Week Day 1

Determine the Loading for slab of Ground floor
Design Column for Ground Floor

2nd Week Day 4~5

Study Theory for design of Stair Slab using MacGinley and Mosley
Revision on Previous learnings of Design

Design of Beam
Design of Slab
Design of Column

2nd Week Day 1~3




Learn Column Design
Learned Loading on Column using Area Method
Created an Excel File to ease up calculation
Study BS8110 for column design requirement
Study Macginley and W.H.Mosley for design methods

1st Week Day 4~5




Learn Design of Slab theoritically using W.H. Mosley - Reinforced Concrete Design.

Learned design of Slab using MTM with 485 wire mesh.
Sketched the cross section for certain floor (1st floor)

Steps Required for Slab Design
Determine Loading Type and total loading
Find perimeter of loading area for punching shear check
Check punching shear using v = v / ud
Design shear Link
As = (v-vc) ud/095fy

For Loading, Check from BS6399 Part 1

1st Week Day 3

Continue checking of beams

Checking of Beams Included:

Total Reinforcement Required : Compression and Tension
Total Deflection Of Beam
Cracking Check
Adequacy of Steel Bars
Requirement and Size of Shear Reinforcement

Received new ID and Computer Account from SKM

1st Week Day 2




Practice Design of Beam using BS 8110 Part 1
Learn to use MTM and Acad to design beam

Tuesday, April 20, 2010

1st Week Day 1





Placement of Seat, Introduction of staffs by Ms. Janet
Staffs Inclusive of :
MBIF
EXXONMOBIL
SHELL

Review Learnings of Beams

Tuesday, April 6, 2010

IT - First Day

Yesterday was my First day for industrial Training.
However, my Wireless Adapter was in a a mess and i couldn't write a blog in time.


Oh, Back to IT

I'm Doing my Industrial Training in Sinclair Knight Merz, in short, SKM now. You can view the company's profile here http://www.skmconsulting.com/

I will be doing my internship under Structural Department leaded by Mr. Karthe which is a very friendly and nice person. The person incharge of my training is Ms. Shiao Teng who specialized in building designs.

For the First day, I've learn how to do checking on beams using MTM, which is an in-house software of SKM Sdn Bhd.


That's all for this post, will post again real soon!