10th Week Day 3~5

Helped Ms. Inez in checking of markings schedule and column markings.
o Check the drawing to match the value in drawing with given data.
o Check the label of column to match with the label a floor below it.
o Create an excel spreadsheet to ease up the checking and data finding.





Above is the formulised excel spreadsheet screenshot

For the excel spreadsheet I have created, I have to include recommendations to client, such as Revision required on Pile Group Design, Recommendation Length and Reduction of length.

According to a senior engineer, we cannot ask them to change their pile as we are only consultant and whether to use our recommendation is up to the judging of developer. The reason for this is because if we force them to use certain length of pile, the responsibility will be ours if the foundation fails.